On friday i built my topo and I terminated my footing calculations in the early evening , but could not proceed with the excavation until prof. Gery had them checked off.
![](http://1.bp.blogspot.com/_3wFAe5sLpSQ/SSHUtfOwVjI/AAAAAAAAAtE/xF6O1wgBjxs/s400/drilling-footing.jpg)
I was able to start and complete excavation on saturday.
![](http://1.bp.blogspot.com/_3wFAe5sLpSQ/SSHVhkXf51I/AAAAAAAAAtM/IiZSk5u9zA8/s400/caissons.jpg)
![](http://2.bp.blogspot.com/_3wFAe5sLpSQ/SSHVlHlWTTI/AAAAAAAAAtU/9MDigh6DpQk/s400/footing1.jpg)
On Sunday morning I poured my caissons and footings with the help of Eddy.
After that, I spent most of my time helping other students, while waitning for my concrete to dry.